The contract scope of work included Planning and 20% schematic design for a facilities improvement and repair project as established by the BIA Department of Facility Management & Construction. The intent of the SOW was to provide a 20% Schematic Design package to investigate campus FI&R projects to include wastewater piping replacements, complete interior renovations, roof replacements, loading dock replacement, storefront glazing replacement and fire alarm systems replacement. Additional campus site utility work includes the replacement of cast iron wastewater lines. These projects are to be constructed at various locations throughout HINU campus and will be coordinated according to campus priority and operations.
The scope of work was built from 10 existing work orders within the BIE Maximo system.